Case Studies
A selection of projects managed by Mascot is provided below:
The following projects are just a selection of the 800+ projects we have been commissioned on over the last 20 years.
Case Studies
Mid-Yorks NHS Trust
Mascot Management were appointed as Clients Representative (Trust Project Manager) from October 2022.
read moreInterflora House
Interflora House refurbishment - transforming a historic and prominent building in Sleaford highstreet into a modern and vibrant workplace,
read moreBradford NHS Trust
The works involved heavy refurbishments of existing areas near/adjacent to live areas, including during the COVID-19 Pandemic.
read moreSheffield Hallam University - Simulated Hospital Ward
This project was established to create a realistic hospital setting to be used as part of the University's nursing and midwifery schools,
read moreHallam Towers, Fulwood Sheffield
The project involved the demolition of the original Hallam Towers Hotel and redevelopment of the site to provide a new 14-storey tower with
read moreExtra MSA - Leeds Skelton Lake Services
The project involved a comprehensive redevelopment of land to the south of Junction 45 of the M1 Motorway to provide a new concept Motorway
read moreVP12A, Ellesmere Port, Cheshire
Construction of a new cardboard box manufacturing facility.
read moreThe Glass Yard, Chesterfield
A new industrial style, two storey commercial development on Sheffield Road.
read moreHotel Van Dyk, Chesterfield
This two phased project included alterations to the original listed building and a new build hotel extension.
read moreMcLaren Automotive, Composites Technology Centre, AMP
Conversion of a new warehouse into a new production facility to produce carbon fibre tubs for McLaren super cars.
read moreDuckmanton, Chesterfield
Site development of 33 houses, a mix of semi-detached and detached for general sale.
read moreSheffield Arena Ice Chiller Plant and Anti-Terrorism Bollards
The project involved the installation of a new replacement ice chiller plant and installation of a series of external anti-terrorism bollards.
read moreWikiHouse Pilot Project, Sheffield
The WikiHouse Pilot project was delivered for our client South Yorkshire Housing Association (SYHA) to provide 2 modern and durable houses on a
read moreB Braun Medical
Extension to existing CAPS building, the works being undertaken while the existing facility remained fully operational.
read moreProvincial House, Sheffield
Conversion and refurbishment of a listed property, together with the construction of 3 new buildings into a mix of studios and apartments.
read moreSheffield Institute of Arts
Restoration and refurbishment of former Head Post Office for Sheffield Hallam University's relocation of Sheffield Institute of Arts.
read morePonds Forge, Sheffield
Refurbishment of the Gym and Changing Facilities at Ponds Forge International Sports Centre
read moreCTi Extension, AMRC
Extension of the existing Castings Technology International factory workshop and office areas based in the Advanced Manufacturing Research
read moreUniversity of Sheffield Management School Tier 2
Following on from the success of the Tier 1 works, we were appointed by the University of Sheffield on the expansion of office space and
read moreArundel Building, Sheffield
Alterations and refurbishment of an existing 5 storey building adjacent to the new Charles St building to which it is linked at level 3.
read moreProject Polaris, University of Sheffield
Refurbishment and extension of a Victorian Building within a conservation area for the University of Sheffield.
read moreGreat Denham, Bedford
Design and Build of new retail scheme for Wilson Bowden Developments
read moreDerby Magistrates Court
Conversion of former Magistrates Courts into new managed office space.
read moreUniversity of Sheffield Management School
Alterations and Refurbishment of existing building to create new Management School
read moreLondon Court, Sheffield
Construction Management of a new 90 bed student cluster accommodation.
read moreRCAT Town Centre Redevelopment Ph 2
Construction Management of the alterations and refurbishment to the Clifton and Eastwood buildings
read moreCFC Community Trust East Stand Fit Out
Construction Management and other services for the fit out out of the East Stand of the Pro Act Stadium for Chesterfield FC Community Trust
read moreAspect Court, Sheffield
Alterations and refurbishment of existing office block into new teaching space for Sheffield Hallam University
read moreWaste Recycling Centre, Rotherham
Refurbishment and alterations of a former Foundry with Process installations to form a new Waste Recycling Centre.
read moreThink Low Carbon Centre for Barnsley College
The Think Low Carbon Centre is a new knowledge hub for renewable energies and sustainable construction for Barnsley College.
read moreChELSI, University of Sheffield
ChELSI - Chemical Engineering at the Life Science Interfaces - is a unique new research institute at the University of Sheffield.
read moreOneleven Refurbishment, Sheffield
Oneleven Refurbishment and Fit Out for Sheffield Hallam University
read moreBrookfields Park, Wath upon Dearne
Mascot Management were appointed by St Paul's Developments as Employers Agent on a new business park in Wath upon Dearne, Rotherham.
read moreMylnhurst School - Sports Hall & Swimming Pool
New swimming pool and sports hall at Mylnhurst School in Sheffield.
read moreLiverpool One
Grosvenor Developments flagship redevelopment of the retail and commercial sector of the city centre to create Liverpool One.
read moreWards Brewery, Phase 2
Design and Build of £13m residential development, adjacent to our offices in Sheffield.
read moreTameside General Hospital
Provision of Bid and Design Management services for 2 new hospital wings, 20,000m2 in total.
read moreHounds Hill Shopping Centre, Blackpool
Refurbishment and extension to a 1970's shopping centre.
read moreLeeds City Museum and Resource Centre
Mascot project managed this project through the Stage 2 Heritage Lottery Fund application and through the pre-contract stages.
read more